We will be happy to supply any further information you may require concerning the engines solutions available.
Keep engines flying
We know what to do anywhere, anytime
As an airline-MRO, we understand the challenges associated with AOGs, and we do everything we can to avoid the need to send an engine to the workshop.
About Us
Our on-wing and on-site solutions are all about avoiding unnecessary costs, minimizing TAT, and preserving the continuity of your operations while improving the environmental footprint of the maintenance.
We have a specialized multi-disciplinary team, comprising about 30 staffs: team leaders, mechanics, engineering, technical office, logistics and support functions.
Our team is able to handle LEAP-1A/1B CFM56-5B, GE90-94/115, and Trent XWB-84. We can release you on EASA, FAA, CAAC and others release certificates based on your needs.
On-wing service capability list
Customer Cases
Air Mauritius (MAU)
📍 CDG, France
📅 February 2025
❓Protocolar boroscopic inspection on the compressor blades of 4 Trent XWB engins across two A350 aircraft.
✔ Despite tight operational windows and adverse weather conditions on the tarmac, our OWS team ensured that both interventions were completed on time.
🗨 “We thank the AFI KLM E&M OWS team for the intervention performed. All updates on the inspection and the reports were provided promptly."
Nouvelair (LBT)
📍 Monastir, Tunisia
📅 January 2025
❓Following the Customer Notification Report (CNR) issued for compressor efficiency, the subsequent BSI revealed multiple findings on the HPC blades.
✔ A top case removal was initially proposed to replace the damaged HPC blades. However, due to the condition of both cases, a full top/bottom case repair was required to restore the compressor’s serviceability.
🗨 “We are extremely satisfied with the support provided by the OWS team from your engine services division. Their responsiveness, the quality of the technical solutions implemented, and the professionalism and availability of the teams during their interventions in Monastir were truly outstanding.”
Cambodia Airways (KME)
📍 Kuala Lumpur, Malaysia
📅 July 2024
❓ KME AOG situation due to a borescope inspection that revealed not acceptable damage on some high-pressure nozzle guide vanes (NGV HP) (CFM56-5B).
✔ Defective HP NGV were removed and replaced.
🗨 “KME is satisfied with AFI's service on engine on-wing repair. AFI's response is quick and efficient. The on-wing support on-site team is professional and experienced.”
Air Asia (APG)
📍 Manilla, Philippines
📅 June 2024
❓ Magnetic presence of particles, revealed AGB (Accessory Gear Box) deterioration. (CFM56-5B)
✔ Replacement of the AGB.
Uzbekistan Airways (UZB)
📍 Tashkent, Uzbekistan
📅 May 2024
❓ A LEAP-1A engine leased to Uzbekistan Airways (UZB) reached lease contract due date. The lessor (Willis) demands that UZB proves engine condition before giving it back to them.
✔ Perform required tasks on contractual basis between UZB and Willis: Long term preservation, full BSI with report, several checks and inspections.
Air Senegal (SZN)
📍 Dakar, Senegal
📅 May 2024
❓ High engine vibrations and magnetic particles revealed damages on the TGB (Transfer Gear Box) and RDS (housing radial shaft drive) that lead SZN plane to an AOG condition. (CFM56-5B)
✔ Proposal of serviceable TGB and RDS, and on-site replacement to allow SZN to keep up operations in short delay.
Philippines Airlines (PAL)
📍 Manila, Philippines
📅 April 2024
❓ The IGV and VSV actuating ring as well as guide pads of a GE90-115 engine found out of service.
✔ To get the engine back into service, the IGV/VSV system, bushings and guide pads were replaced.
Air Austral (REU)
📍 Paris, France
📅 April 2024
❓ Fan abradable erosion out of limits that may cause low fan performance as well as a FOD (foreign object damage) problem. (GE90 Series)
✔ Fan Case seal repair On-Wing to keep engine flying and reduce grounding time.
Air Asia (APG)
📍 Manilla, Philippines
📅 March 2024
❓ A defect found during a borescope inspection of the HPC blades. The defect is out of tolerance, so it must be repaired. (CFM56-5B)
✔ A boroblending task was proposed to avoid HPC module exposure and the risk of major repairs on the engine.
Philippines Airlines (PAL)
📅 September 2023
❓No slot available at Manilla for Ge90-115 engine change.
✔Ferry flight organized between Manilla and Paris (ORY) to proceed with an engine change at Air France facilities operation performed in cooperation with Air France team
Singapore Airlines (SIA)
📍 Singapore
📅 July 2023
❓ A broken stud was stuck on the AGB (Accessory Gear Box). (GE90 Series)
✔ Fitting task performed to replace damaged stud on the AGB
Garuda (GIA)
📍 Jakarta, Indonesia
📅 July 2023
❓ LPT6 blades interlock inspection reduced remaining cycles up to 0. (GE90 Series)
✔ On-site LPT6 quick change campaign
Volotea (VOE)
📍 Verona, Italia
📅 April 2023
❓ Some defects out of tolerance found on HPT blades, probably due to a FOD, so the CFM56-5B engine must be repaired.
✔ Damaged HPT blades were replaced to return engine to operations.
Philippines Airlines (PAL)
📍 Manilla, Philippines
📅 February 2023
❓ Due to a FOD, several HPC blades presented defects out of tolerance that need to be replaced before next engine operation.
✔ Top/Bottom Case operation was performed on a CFM56-5B to replace out of damaged parts: HPC blades, variable sector vanes (VSV), shrouds and seals.
🗨 “Philippine Airlines greatly appreciates AFI KLM E&M’s rapid on-site support. We’re extremely grateful for the valuable partnership between our two groups.”
Philippines Airlines (PAL)
📍 Manilla, Philippines
📅 3-year campaign from 2023 to 2025
❓ Engines need to be inducted on shop only to replace Fan module that stops operations for several weeks. (CFM56-5B)
✔ Perform swap module on-wing to reduce TAT (Time Around Time) and avoid engine removal.
Druk Air (DRK)
📍 Paro, Bhutan, (AOG Covid)
📅 April 2021
❓ Problem: Druk Air's plane ends up in AOG due to a FOD during the covid crisis. This failure had a major impact, as Druk Air had no spare engines available.
✔ The solution for the FOD damage was to make a top case and replace the carters, as well as the numerous damaged HPC blades. (CFM56-5B)
🗨 “Thank you very much for sending a highly skilled and an efficient team for this intervention. This important and unique intervention was completed successfully. We are impressed and satisfied.”
Our expertise in action
GE90-115 Abradable Repair for Philippine Airlines
GE90-115 Top/Bottom Case replacement for Air Canada
HP NVG replacement for Cambodia Airways
CFM56-5B Top Case Operation